Twinset 300 kVA Silent

Twinset 300 kVA Silent mieten


Recommended accessories



  • IBC 1,300 liter tank min. running time under full load: approx. 26 hours (approx. 1 day)

  • IBC 2,400 liter tank min. running time under full load: approx. 40 hours (approx. 1.5 days)

  • IBC 2,900 liter tank min. running time under full load: approx. 48 hours (approx. 2 days)

  • Tank container 5,500 liters min. running time under full load: approx. 91 hours (approx. 3.5 days)

  • Tank container 11,500 liters min. running time under full load: approx. 191 hours (approx. 7 days)

  • Power cable 4 x 120mm² with M12 cable eyes in lengths of 10, 15, 30, 60 and 90m

  • NH distribution device 3 x DIN 2 + 4 x DIN 00

  • Distribution box 2 x 63 A CEE + 2 x 32 A CEE + 2 x 16 A CEE + 6 x 230 V (Schuko)

  • Automatic 500 A for classic emergency power operation


This is only a small part of our wide range of accessories. Under the following link you will find further suitable Accessories. Some accessories could probably be displayed here in the form of article boxes (light mast, tank, distributor). However, you would only jump to the corresponding item and from there to the request form.

On Request

Request now
Artikelnummer: TS0002 Categories: ,
Power 400 V (3~) 240 kW, 300 kVA
Sound pressure 72 dB(A) at 7 Meter
Fuel Heating oil or diesel
Tank capacity 1.800 l (internal, double-walled)
Consumption per hour approx. 60 liters/hour at maximum output
Runtime approx. 30 hours
engine not specified
Connections Connecting rails
Dimensions in cm (LxWxH) 6.060 x 2.440 x 2.750
Weight in kg 12.700 empty, 14.200 full
Version soundproofed
Motor control electronic
Voltage regulation Automatic voltage regulation (AVR)
Frequency 50 Hz
Environment Leak monitoring system
Extras Lockable, fixed lifting point
Low oil cut-off No
SKU TS0002

Beschreibung

Twinset 300 kVA Silent mieten

Recommended accessories

  • IBC 1,300 liter tank min. running time under full load: approx. 26 hours (approx. 1 day)
  • IBC 2,400 liter tank min. running time under full load: approx. 40 hours (approx. 1.5 days)
  • IBC 2,900 liter tank min. running time under full load: approx. 48 hours (approx. 2 days)
  • Tank container 5,500 liters min. running time under full load: approx. 91 hours (approx. 3.5 days)
  • Tank container 11,500 liters min. running time under full load: approx. 191 hours (approx. 7 days)
  • Power cable 4 x 120mm² with M12 cable eyes in lengths of 10, 15, 30, 60 and 90m
  • NH distribution device 3 x DIN 2 + 4 x DIN 00
  • Distribution box 2 x 63 A CEE + 2 x 32 A CEE + 2 x 16 A CEE + 6 x 230 V (Schuko)
  • Automatic 500 A for classic emergency power operation

This is only a small part of our wide range of accessories. Under the following link you will find further suitable Accessories. Some accessories could probably be displayed here in the form of article boxes (light mast, tank, distributor). However, you would only jump to the corresponding item and from there to the request form.

Zusätzliche Informationen

Power 400 V (3~) 240 kW, 300 kVA
Sound pressure 72 dB(A) at 7 Meter
Fuel Heating oil or diesel
Tank capacity 1.800 l (internal, double-walled)
Consumption per hour approx. 60 liters/hour at maximum output
Runtime approx. 30 hours
engine not specified
Connections Connecting rails
Dimensions in cm (LxWxH) 6.060 x 2.440 x 2.750
Weight in kg 12.700 empty, 14.200 full
Version soundproofed
Motor control electronic
Voltage regulation Automatic voltage regulation (AVR)
Frequency 50 Hz
Environment Leak monitoring system
Extras Lockable, fixed lifting point
Low oil cut-off No
SKU TS0002